The project included the removal of existing asphalt pavement, construction of the proposed concrete roundabout, construction of proposed sidewalk, relocation and extension of existing storm sewer, the relocation of existing waterline, relocation of existing utilities, the required erosion and sediment control measures, and all other necessary appurtenances required to construct this roundabout at Main Street.