Astra Construction Services (ACS) is currently teamed with Clark Patterson Lee Architects for the design and construction of a 11,462 SF Tactical Unmanned Aircraft System (TUAS) Ready Building… er um Drone Hangar… on a 10-acre site that will serve maintenance, administration and operations functional areas. The aircraft maintenance bay has spaces for four (4) RQ-7B Shadow TUAS units each with 20’ wingspan as well as tactical vehicles and equipment. An adjoining one-story structure will house administration offices, flight operations space and other support and utility rooms.

ACS is also responsible for site work, grading, a parking lot, curbing, paving, trash enclosures, bollards, sidewalks, Anti-Terrorism Force Protection (ATFP), supporting infrastructure and incidental related work. Completion is slated for September 2018.